FedEx Facility Stamp – North Phoenix

Client
Confidential (FedEx facility project)
Industry
Logistics & Distribution
Location
Phoenix, Arizona
Dates
2025 – 2025
Team Size
1
Services
• Electrical drawing review and stamping
• Code compliance verification for distribution facility
• Rapid turnaround for building permit approval
Summary
Provided urgent PE stamping of electrical drawings for a FedEx distribution facility in North Phoenix, ensuring code compliance and enabling the client to secure a building permit on a tight timeline.
Problem / Objective
FedEx needed a professional engineer to review and stamp their facility's electrical drawings to meet code and obtain permit approval quickly.
Process
• Reviewed the facility's electrical drawings and calculations
• Provided markups and ensured all code requirements were met
• Applied PE stamp to drawings for permit submission
• Delivered stamped drawings within 24 hours to meet an urgent deadline
Payoff / Results (Metrics)
• Achieved building permit approval quickly
• Ensured compliance with electrical codes and safety standards
• Saved client time with rapid turnaround
• Enabled construction to proceed without delays