Off-Grid Franklin Battery Systems, PE Stamp

Client
Confidential (Hawaii electrical contractor)
Industry
Residential/small-site solar plus battery storage (off-grid)
Location
Hawaii.
Dates
September 2025
Team Size
1
Services
Electrical review of three off-grid PV plus battery design sets
Review of cable and string sizing calculations
Off-grid operation and battery-depletion review
PE stamp on each set
Summary
A Hawaii contractor sent MHL three off-grid PV plus battery designs built around FranklinWH aPower batteries and aGate controllers. MHL reviewed each set and the supporting calculations, raised an off-grid recharge concern, and stamped all three after the contractor revised the drawings. The work ran from September 2 to 11, 2025.
Problem / Objective
The contractor needed a Hawaii PE review and stamp on three off-grid systems. One question was how the batteries would recharge after depletion, since the GoodWe inverters are not explicitly listed for off-grid use.
Process
Received three sets: 15.66, 13.05 and 6.96 kW DC arrays with one, two and three-battery stacks (13.5 to 40.5 kWh usable); two use GoodWe inverters (11.4 and 9.6 kW AC) and one uses Enphase microinverters (5.856 kW AC), all single-phase 240V.
Sent common review comments for all three sets and requested the cable and string sizing calculations.
Raised the battery-depletion and black-start question and recommended considering a generator.
Reviewed the contractor’s calculations and agreed to two drawing notes: one setting the scope boundary at the aGate, with the downstream 100A panel by others, and one describing grid-forming operation, minimum state of charge, and black-start.
Reviewed the revised sets for all three systems.
Stamped and returned all three sets.
Payoff / Results (Metrics)
Three sets stamped in about nine days.
Scope boundary written into the drawings: the contract ended at the aGate, with downstream loads by others under NEC Article 220.
Off-grid operation, minimum reserve, and black-start behavior documented on the sheets, with generator backup noted as optional.
Calculation errors the contractor found in two sets were corrected before the stamp.
When this applies
A Hawaii solar or electrical contractor designing off-grid or backup PV plus battery systems (FranklinWH aPower and aGate, GoodWe or Enphase inverters) and needing a PE review and stamp. It also helps if you need to address battery depletion, black start, or the line between your scope and downstream panels.