Client

Confidential (consulting engineer)

Industry

Commercial building electrical plans

Location

​

Dates

February 2026 (received and returned 2/10/2026)

Team Size

1

Services

  • PE review of a six-sheet electrical plan set

  • PE stamp and signed PDF

  • Same-day delivery

Summary

A consulting engineer sent a six-sheet commercial electrical plan set (dated 2/7/26) for stamping and asked for it back as soon as possible. MHL returned the stamped set the same day.

Problem / Objective

The plans needed a licensed PE’s review and stamp, on a rush basis.

Process

  1. Received the six-sheet electrical set by email.

  2. Reviewed the sheets.

  3. Applied the PE stamp and signature to each sheet.

  4. Returned the stamped PDF with an invoice link.

Payoff / Results (Metrics)

  • Stamped set returned about three and a half hours after receipt (per timestamps)

  • Client confirmed receipt the same day

  • Led to two further stamp requests from the same client within ten days

When this applies

A consulting engineer or designer with a small commercial electrical plan set that needs a PE stamp today, not next week.