Licensed in AZ, CA, CO, HI, IL, KY, NV, OR, PA, TX, UT, VA (and more on request).


PRICING
STRAIGHTFORWARD PRICING FOR PERMIT DRAWING WORK
Every project is different, but here’s where most jobs start. Send us your details for an exact quote.
Typical starting ranges
Service | Basic | Standard | Complex / Custom |
|---|---|---|---|
Panel & Service
Upgrades | $1,500+
Single panel,
straightforward scope | $2,500+
Multiple panels or added
distribution | Custom quote
Service changes,
coordination, unusual
constraints |
EV Charger
Permits | $1,800+
Simple permit set | $2,800+
More chargers or
service impact | Custom quote
Utility coordination,
larger sites |
Generator &
Backup Power | $2,000+
Straightforward
generator permit | $3,500+
ATS and broader
distribution scope | Custom quote
Complex facilities, multi-
equipment jobs |
Lighting / TI | $1,500+
Small remodel or
lighting upgrade | $2,500+
Broader TI package | Custom quote
Larger commercial
scope |
PE Review /
Redlines | $900+
Focused review | $1,500+
Broader package review | Custom quote
Major redesign,
stamping, AHJ support |
Note: Final quote depends on jurisdiction, available information, required turnaround, and scope complexity.
Add-on services
Add-on | When it applies | Starting price |
|---|---|---|
Expedited turnaround | You need the package this week | +25–50% on base fee |
Additional plan-check
response cycle | AHJ comments beyond the
included revision | $450–$900 per cycle |
Site verification visit | Inputs are incomplete or low-confidence | $750–$2,500 (travel billed
separately) |
Title 24 lighting
documentation | Required for nonresidential
lighting changes in CA | $750–$2,000 |
Permit expediting | Submission and follow-up with the jurisdiction | Contact us for details |
Revision policy
-
What counts as a revision cycle: One consolidated response package — we address all plan-check comments in a single updated set.
-
What’s included: Base packages include 1–2 plan-check response cycles depending on scopecomplexity.
-
What triggers additional charges: Added loads or equipment after scope freeze, architectural layout changes after first issue, missing inputs discovered after engineering has started, orchanges to the installation approach that affect the engineering.
.png)